Here's the list I started with in January:
1.
2.
3.
4.
5.
6. String Blocks Quilt
7.
8. Bento Blocks Quilt
9. Breath of Avignon Quilt
10.
11. GMFG - this one is about 2/3 completed
12.
13. Basket Quilt
And I did go on a sandwiching spree this week and got three quilts sandwiched; the string block quilt and the bento block quilt are sandwiched...
And the bow tie quilt is DONE!
It shouldn't be too hard to finish both the string block and the bento quilts since the worst part of the job is done.
I've made wonderful progress on the Grandmother's Flower Garden - more than I ever expected - but I still have a couple of long rows to do to finish the top... and I think I'll count that as a finish. If I decide to hand quilt it, it may be another couple of years before this one is done.
So, with three months left in 2013, I have 5 quilts left to finish. Two of those are already sandwiched and ready to quilt, so they are well on their way. I think I will be able to finish the GMFG top by the end of the year. That will just leave the Breath of Avignon and the Basket quilt to finish before the December.
Who knows, I might actually make it!
I love the look of your string quilt. I have a lot of these blocks too, but I probably need more for an entire quilt. Good luck with your finishes!
ReplyDelete